Summary data Ministries and Akimats
Contact details for a single pool of investment projects:
Email: projects@invest.gov.kz
Phone: +7 7172 620-620
For reference: The single pool of investment projects includes projects according to the following criteria: project cost from 500 million tenge or more; projects of private business entities (domestic and foreign investors); projects of the non-resource sector, with the exception of the construction of residential complexes. Information is updated once a quarter. The data in the pool may change due to the development of projects at different stages.
Date of publication: 30.12.2022
(updated quarterly)
Investment project | Investor's country | Start date | Date of entry | Region | CGO | Jobs | Project cost, million tenge | Project status | Contact phone number | |
---|---|---|---|---|---|---|---|---|---|---|
Construction of a dormitory | Kazakhstan | 01.01.2021 | 31.12.2023 | Shymkent city | MES | 50 | 1 757 | Construction and installation works | ||
Production of cast iron, steel and ferroalloys | Luxembourg | 30.12.2022 | 01.01.2031 | Karaganda region | MIID | 0 | 1 500 000 | Legal documents preparation | ||
Hydrogen production | Germany | 01.01.2021 | 31.12.2031 | Mangistau region | MoE | 0 | 1 500 000 | Legal documents preparation | ||
Production of tomato paste | Turkey | 01.01.2023 | 31.12.2025 | Kyzylorda region | MoA | 154 | 28 100 | Legal documents preparation | ||
Electricity generation by hydroelectric power plants | Kazakhstan | 05.02.2024 | 28.12.2026 | Jetysui region | MoE | 5 | 7 700 | Legal documents preparation | ||
Construction of a student dormitory | Kazakhstan | 01.01.2020 | 31.12.2023 | Karaganda region | MES | 30 | 1 500 | Construction and installation works | ||
Fruto -Guide | Kazakhstan | 01.03.2023 | 30.11.2025 | Almaty region | MoA | 15 | 32 588 | Legal documents preparation | ||
Construction of a brick factory | Kazakhstan | 01.01.2022 | 31.12.2022 | Akmola region | MIID | 231 | 27 000 | Commissioning | ||
Construction of an integrated gas chemical complex for the production of polypropylene (Stage 2) | Russia | 01.01.2023 | 31.12.2027 | Atyrau region | MoE | 740 | 3 268 000 | Legal documents preparation | ||
Production of petrochemical products | The Republic of Korea | 26.01.2023 | 30.12.2027 | Aktobe region | MIID | 1000 | 1 500 000 | Legal documents preparation | ||
Construction of a tourist district | UAE | 01.01.2020 | 31.12.2026 | Astana city | MoCS | 1500 | 1 000 000 | Construction and installation works | ||
Construction of an integrated gas chemical complex for the production of polypropylene (Stage 1) | China | 01.01.2017 | 30.06.2022 | Atyrau region | MoE | 506 | 814 289 | Commissioning | ||
Construction of a combined cycle plant with a capacity of 926.5 MW with a flexible generation mode | Kazakhstan | 01.01.2024 | 30.12.2026 | Turkestan region | MoE | 250 | 722 700 | Legal documents preparation | ||
The greenhouse complex | Kazakhstan | 01.02.2021 | 31.08.2024 | Astana city | MoA | 100 | 7 700 | Financing | ||
Fruto -Guide | Kazakhstan | 01.08.2023 | 30.09.2025 | Almaty region | MoA | 68 | 5 000 | Legal documents preparation | ||
Processing and enrichment of copper | Russia | 01.01.2024 | 12.08.2026 | Jetysui region | MIID | 1500 | 702 000 | Legal documents preparation | ||
Construction of "Abu Dhabi Plaza" multifunctional complex | UAE | 02.01.2014 | 31.12.2023 | Astana city | MTI | 2000 | 672 000 | Construction and installation works | ||
Construction of a mining and processing plant | Kazakhstan | 11.03.2019 | 31.12.2026 | Abai region | MIID | 2199 | 560 500 | Legal documents preparation | ||
Production of tereftallic acid and its salts | Kazakhstan | 01.01.2022 | 31.12.2024 | Atyrau region | MoE | 336 | 500 000 | Legal documents preparation | ||
Fertilizer production | Russia | 01.01.2022 | 31.12.2025 | Jambyl region | MIID | 1200 | 500 000 | Legal documents preparation | ||
Launch of 5G network | Kazakhstan | 20.12.2022 | 03.01.2025 | Interregional | MDAI | 0 | 442 000 | Legal documents preparation | ||
Irrigation 1065 ha | Kazakhstan | 01.01.2021 | 31.12.2023 | Aktobe region | MoA | 15 | 4 700 | Financing | ||
Flying theatre | Kazakhstan | 01.01.2020 | 30.12.2022 | Astana city | MoCS | 50 | 4 500 | Construction and installation works | ||
Poultry Factory | Kazakhstan | 01.01.2023 | 31.12.2025 | Aktobe region | MoA | 75 | 4 000 | Financing | ||
Construction of a potassium fertilizer plant at Satimola and Chelkar deposits | Kazakhstan | 01.01.2022 | 31.12.2026 | West-Kazakhstan region | MIID | 1400 | 436 034 | Legal documents preparation | ||
Production of butadiene and its derivatives | Russia | 01.01.2022 | 31.12.2026 | Atyrau region | MoE | 440 | 414 520 | Legal documents preparation | ||
Construction of a gas processing plant | Kazakhstan | 01.01.2017 | 31.12.2025 | Atyrau region | MoE | 550 | 380 831 | Construction and installation works | ||
Oil production | Kazakhstan | 30.12.2022 | 30.12.2023 | Shymkent city | MoE | 800 | 351 500 | Legal documents preparation | ||
Construction of an enrichment factory in the Kachard career | Kazakhstan | 03.01.2022 | 03.01.2030 | Kostanay region | MIID | 180 | 350 000 | Legal documents preparation | ||
Poultry farm | Kazakhstan | 01.01.2022 | 30.11.2023 | Almaty region | MoA | 180 | 3 800 | Commissioning | ||
Irrigation | Kazakhstan | 01.01.2021 | 31.12.2022 | Akmola region | MoA | 12 | 3 200 | Commissioning | ||
Storage | Kazakhstan | 01.02.2021 | 31.03.2022 | Jambyl region | MoA | 10 | 2 600 | Commissioning | ||
Construction of an industrial park | China | 14.04.2020 | 29.12.2025 | Jetysui region | MIID | 2000 | 330 000 | Legal documents preparation | ||
Construction of the high-speed Main Line "Turkestan - Shymkent - Tashkent" | Kazakhstan | 01.01.2022 | 31.12.2025 | Turkestan region | MIID | 0 | 322 000 | Legal documents preparation | ||
Construction of 600 MWt combined cycle power plant | Kazakhstan | 01.01.2022 | 31.12.2026 | Almaty city | MoE | 249 | 315 000 | Legal documents preparation | ||
Construction of a metal processing and extraction plant | Russia | 04.01.2022 | 03.01.2027 | Kostanay region | MIID | 1200 | 315 000 | Legal documents preparation | ||
Reclamation of tailings and construction of a mining and processing plant | Kazakhstan | 21.11.2022 | 25.08.2031 | Jetysui region | MIID | 550 | 270 700 | Legal documents preparation | ||
Irrigation | Kazakhstan | 01.05.2022 | 31.12.2022 | Pavlodar region | MoA | 30 | 1 700 | Commissioning | ||
Storage | Kazakhstan | 01.05.2021 | 30.09.2022 | Akmola region | MoA | 30 | 1 500 | Commissioning | ||
Storage | Kazakhstan | 01.06.2021 | 31.03.2022 | North-Kazakhstan region | MoA | 10 | 1 500 | Commissioning | ||
Alumina production factory | Kazakhstan | 03.01.2021 | 03.01.2028 | Kostanay region | MIID | 1000 | 263 927 | Legal documents preparation | ||
Sugar production | Turkey | 26.01.2023 | 25.12.2025 | Aktobe region | MoA | 180 | 250 000 | Legal documents preparation | ||
Processing and enrichment of nickel ores | The Republic of Korea | 01.01.2023 | 30.12.2026 | Aktobe region | MIID | 500 | 246 525 | Legal documents preparation | ||
Construction of a steelmaking factory | Kazakhstan | 01.01.2022 | 31.12.2025 | Aktobe region | MIID | 1800 | 242 142 | Construction and installation works | ||
Industrial development of polymetallic ores Shalkiya deposit | Kazakhstan | 01.01.2022 | 31.12.2025 | Kyzylorda region | MIID | 1540 | 235 000 | Construction and installation works | ||
Construction of a mining and processing plant | Kazakhstan | 09.09.2021 | 31.12.2024 | East Kazakhstan region | MIID | 1000 | 216 600 | Legal documents preparation | ||
Storage | Kazakhstan | 01.04.2021 | 31.10.2022 | Akmola region | MoA | 21 | 1 278 | Commissioning | ||
Storage | Kazakhstan | 01.02.2021 | 31.12.2022 | Jambyl region | MoA | 15 | 1 200 | Commissioning | ||
Construction of a thermal power plant with a capacity of 250 MW | Turkey | 01.01.2023 | 31.12.2025 | Kyzylorda region | MoE | 0 | 215 000 | Legal documents preparation | ||
Sodium hydrogen carbonate production (sodium bicarbonate) | Turkey | 01.01.2021 | 31.12.2024 | Jambyl region | MIID | 350 | 200 000 | Construction and installation works |