Construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW Main water intake «Zhaugashty» on the Kurchum River
Construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.5 MW Main water intake «Zhaugashty» on the Kurchum River
The project provides for the construction of a small hydroelectric power plant (HPP) with an installed capacity of 0.3 MW at the main water intake Zhaugashty in the Kurchum district of East Kazakhstan region. The maximum power generation capacity is 1,080,000 kWh.
- Indicator Results
- Investment amount, thousand US dollars 1 133 825
- NPV of the Project thousand, US dollars 460 948
- IRR, % 19
- EBITDA yield, %
- Payback period, years 14
- Discounted payback period, years - - 16