investment projects

Increase in the resource base and expansion of gold production in the Tobolsk area of deposits

  • Indicator Results
  • Investment amount, thousand US dollars 70 800
  • NPV of the Project thousand, US dollars 39 479
  • IRR, % 25,1%
  • IBITDA yield, % 30%
  • Payback period, years 8,5
  • Discounted payback period, years - - 10,2

Project Description:

The project provides for the exploration, production and processing of gold-bearing ores of the Tobolsk area of ​​deposits (the “Project”).

Project Goals:

  • increase in capacities for extraction/processing of oxide ores;
  • detailed geological exploration of sulfide ores with commercial reserves;
  • increase in capacities for the extraction and processing of oxide ores.
  • Construction of a plant for the processing of sulfide ores Marketable products: Dore alloy

Initiator:

LLP "Brendt" is mining oxide ores with finishing to the "Dore" alloy. Processing of ores is carried out in an open way. The current mining/processing capacity is 800 thousand tons of ore per year.

Planned capacity: Annual volume of extraction and processing of sulfide ores at the level of 1.8 million tons of ore.

Sales market: Kazakhstan

Market preconditions:

Consistently high demand - Gold consumption in the world is at a consistently high level. It is used in technology in the form of alloys with other metals, in the aviation and space industries, radio equipment, electronics, and medicine. A significant part of the gold goes to the manufacture of jewelry. It also plays the role of the main currency metal.

Availability of a client base - In Kazakhstan, gold consumption is mainly formed for the purpose of replenishing the country's foreign exchange reserves as a result of processing by three refineries: Kazzinc in Ust-Kamenogorsk, Kazakhmys in Balkhash and TauKen-Altyn in Nur-Sultan . According to experts, by 2020 refining will reach 80-90 tons per year.


Reserves and resources of the Tobolsk area, JORC calculation

JORC classification
Oxidized ore
Sulphide ore
Total

Gold, kg
Content
gr/t

Gold, kg
Content
gr/t

Gold, kg
Measured Resources
5 324
1,42


5 324

Verified Resources

5 686
1,5


5 686

Estimated Resources

5 537
1,48
22 434
2,0
27 971

State Reserves Commission RZ

3 337
1,4
40 100
2,0
43 437

Total

19 884
1,42
62 534
2,0
82 418
Return back
Install the application:
1) Open the website in Safari
2) Click save
3) Add to home screen