Success Story

АО ArcelorMittal Tubular Products Aktau

On December 6, 2017, a plant for the production of butt-welding pipes was launched in the framework of the nationwide teleconference with the participation of the Head of State Nursultan Nazarbayev in the Mangystau region ”JSC ArcelorMittal Tubular Products Aktau. The cost of the project with the participation of foreign capital is 6.8 billion tenge. Production capacity - up to 15 thousand tons of welding joints per year. The plant for the enlarged assembly of oil and gas pipes into 24-meter sections was built specifically for the Future Expansion Project / Wellhead Pressure Management Project (FGP / WPMP) of the Tengizchevroil company.

Install the application:
1) Open the website in Safari
2) Click save
3) Add to home screen